CLIENT    :    PROCTER & GAMBLE (Modern Industries Co.) SECOND INDUSTRIAL CITY, DAMMAM.

WORKS DONE :

  • Roof water proofing with FM approved material for new W/H
  • Truss strengthening for conveyor hanger
  • Fabrication and erection of mezzanine floor
  • Fabrication and fixing of processing water tank
  • Fabrication and erection of mezzanine floor (14mtr x 7mtr)
  • Fixing of load cell in core mixing tanks

CLIENT    :    Saudi Royal Air Defense Ummul Al Sahik

WORKS DONE :

  • Supply / Fabrication / Erection and Painting of warehouse

CLIENT    :    M/s. RCC Al Khobar (JV CRI, Italy)

WORKS DONE :

  • On site fit up and welding of steel liner cans for chimney @Rabigh PP-2
  • Supply / Fabrication of protection barrier for steel liners
  • On site fit up and welding of steel liner cans (Grade A588 Gr. B) @Marafiq Water and Power plant, Yanbu

CLIENT    :    M/s. SIDEM SAUDI Ltd.Al Khobar (Marafiq Project, Jubail)

WORKS DONE :

  • Supply / Fabrication / Erection and Painting of dirty flush water tank at marafiq expansion project (IWPP-1, Jubail)
  • 3500 Cu.M capacity, 19.5 m dia. 12.192m height

  • Supply / Fabrication / Erection and painting of clean flush water tank at marafiq expansion project (IWPP-1, Jubail)
  • 3500 Cu.M capacity, 19.5 m dia. 12.192m height

  • Installation of anodes in sea water pre-heaters
  • Fabrication and Installation of passivation of rapture disc discharge pipes

CLIENT    :    M/s.SALINE WATER CONVERSION CORPORATION.(SWCC) Jubail, K.S.A.

WORKS DONE :

  • Replacement of bottom plate of process water tank (15mtr dia)
  • Replacement of bottom plate of demineralized water tank-B (15mtr dia)
  • Replacement of bottom plate of diesel tank (9.5mtr dia)

CLIENT    :   BASIC CHEMICAL INDUSTRIES 1st Industrial City, Dammam.

WORKS DONE :

  • Renovation of blending plant steel structure
  • P.O Date : 26-02-2008

  • Fabrication and installation of pipelines & erection and alignment of mechanical equipments, precommissioning and assistance in commissioning
  • P.O. Date : 10-01-2007

  • Fabrication, supply and erection of HCL tower structure
  • P.O. Date : 20-05-2006

  • Repair works on hydraulic storage tank
  • P.O. Date : 13-03-2006

  • Fabrication and Installation of safety hand rail
  • P.O. Date : 12-11-2005

  • Fabrication and supply of inlet end box and out let end box
  • P.O. Date : 29-09-2005

  • Fabrication and Installation of service platform
  • P.O. Date : 06-04-2005

  • Repair works and replacement of HCL storage tank
  • P.O. Date : 21-02-2005

  • Design, procurement, fabrication, galvanizing and installation of walk way platform and handrail for storage tanks
  • P.O. Date : 19-02-2005

  • Fabrication and installation 20Cu.M tank(Carbon Steel)
  • P.O. Date : 23-11-2004

  • Supply of material, fabrication and fnstallation of spiral chute and modification of the conveyor
  • P.O. Date : 13-10-2004

  • Maintenance work for HCL acid tank including replacing of handrails and ladder
  • P.O. Date : 21-02-2004

  • Fabrication, supply and erection of pipe lines by removing existing line, erection of mixer and structural work
  • P.O. Date: 14-09-2003

  • Fabrication, supply and erection of dilute H2SO4 tank
  • P.O. Date: 16-08-2003

  • Design, fabrication, supply and erection of oil storage tank, 45 cu. Mtr capacity
  • P.O. Date : 10-06-2003

  • Fabrication, supply and installation of vertical storage tanks (30 Cu. Mtr capacity) including the concrete foundation
  • P.O. Date : 10-06-2003

  • Fabrication, supply and installation of drive agitator for hot melt mixer
  • P.O. Date : 12-05-2003

  • Fabrication and supply of landings with hydraulic jacks
  • P.O. Date : 01-04-2003

  • Replacement of existing tanks and pipelines with new tank and pipelines
  • P.O. Date : 23-03-2002

  • Fabrication and erection of hood and relocation of existing hood
  • P.O. Date : 31-12-2001

  • Fabrication and supply of gas separator
  • P.O. Date : 30-09-2001

  • Fabrication and installation of pipe line for cooling water
  • P.O. Date : 03-01-2001

  • Fabrication and supply of polymeric tower
  • P.O. Date : 24-10-2000

  • Fabrication & erection of chilled water tank
  • P.O. Date : 22-03-1999

  • Fabrication & erection of CL2 absorption tower
  • P.O. Date : 16-06-1998

  • Replacement of cooling water pipe line (SCH 40)
  • P.O. Date : 17-02-1998

  • Fabrication and supply of polymeric vertical pressure vessel
  • P.O. Date : 21-06-1995

  • Fabrication and erection of H2SO4 drain tank including pipe lines
  • P.O. Date : 08-11-1993

  • Fabrication and delivery of storage tank (150 cubic meter)
  • P.O. Date : 02-10-1992

  • Fabrication / erection of mixing tank
  • P.O. Date : 18-06-1992

CLIENT    :   BASIC CHEMICALS NATIONAL CO. (BCI GROUP) LIGHT INDUSTRIAL AREA, YANBU.

WORKS DONE :

  • Fabrication and erection of storage tanks for new sulphuric acid plant
  • a)  Diesel oil storage tank, 3100mm dia, 4000mm height

    b)  Sulphur storage tank, 6000mm dia, 8200mm height

    c)  Acid storage tank, 9100mm dia, 9000mm height

    d)  Acid storage tank, 7200mm dia, 7200mm height

    e) Acid storage tank, 3100mm dia, 4000mm height

    f)  Caustic soda tank, 3100mm dia, 4000mm height

CLIENT    :   M/s. NATIONAL TITANIUM DIOXIDE CO.(CRISTAL) Yanbu Al Sinaiyah, Yanbu.

WORKS DONE :

  • Supply of Material / Fabrication and erection of following tanks
  • a) Trimet tank, 3.7Cu.M Capacity, 1.676m dia. 1.676m height

    b) Cake wash Tank, 28.5Cu.M Capacity, 3.0m dia. 4.0m height

    c) Filtrate surge Tank, 28.5Cu.M Capacity, 3.048m dia. 3.05m height

    d) Larox filter feed tank, 130Cu.M Capacity, 5.715m dia. 5.030m height

    e) Larox filter cloth wash tank, 3.5Cu.M Capacity, 1.5m dia, 2.0m height

    f) Air release tank(316L), 5.7Cu.M Capacity, 2.5m dia, 2.25m height

CLIENT    :   NATIONAL ADHESIVES FIRST INDUSTRIAL CITY, DAMMAM

WORKS DONE :

  • Additional spray lines for the PSHM water bath
  • P.O. Date : 17/03/2008

  • Fabrication, supply and erection of stainless steel pipe lines(500mtrs)
  • P.O. Date : 24/09/2007

  • Fabrication and erection of stainless steel tanks(4No.s X 75Cu.M)
  • P.O. Date : 03-04-2007

  • Fabrication and installation of fire water line
  • P.O. Date: 05-04-2004

  • Fabrication / fixing of safety guard for drainage pipes
  • P.O. Date: 11-04-2004

  • Fabrication of stainless steel filter and air knife support frame
  • P.O. Date: 07-04-2004

  • Fabrication and installation of Jacketed Line for mixer
  • P.O. Date; 01-10-2003

  • Fabrication and installation of GI pipe line
  • P.O. Date: 25-09-2003

  • Fabrication and installation of water bath spray pipe line (S/S 304)
  • P.O. Date: 25-09-2003

  • Fabrication and delivery of hot oil expansion tank
  • P.O. Date: 13-09-2003

  • Fabrication and installation of boiler chimney
  • P.O. Date: 28-06-2003

  • Fabrication and installation of water bath side cover
  • P.O. Date: 02-03-2003

  • Fabrication and installation of airline
  • P.O. Date: 08-02-2003

  • Fabrication and installation of mezzanine floor for production area
  • P.O. Date: 25-12-2002

  • Fabrication and installation of conveyer frame
  • P.O. Date: 25-12-2002

  • Fabrication and installation of stainless steel hopper, water bath stand and dryer fixing
  • P.O. Date: 24-11-2002

  • Erection of mixer, product pump, heat exchanger and EZ melt machine
  • P.O. Date: 11-06-2002

  • Fabrication and installation of jacketed pipeline
  • P.O. Date: 02-10-2002

  • Fabrication and installation of chilled water line
  • P.O. Date: 10-09-2002

  • Fabrication and installation of hot oil pipe line
  • P.O. Date: 05-09-2002

  • Fabrication and installation of mineral oil system
  • P.O. Date: 24-08-2002

  • Fabrication and installation of water bath drainage pipeline
  • P.O. Date: 16-10-2002

  • Fabrication and installation of stainless steel filter (Jacketed)
  • P.O. Date: 25-09-2002

  • Fabrication and installation of water bath (S/S 304)
  • P.O. Date: 24-08-2002

  • Water bath and pipe lines (all in stainless steel, SS 304)
  • P.O. Date : 12-09-2002

  • Fabrication and installation of SS pipeline
  • P.O. Date: 24-08-2002

  • Fabrication and installation of carbon steel jacketed pipeline
  • P.O. Date: 29-06-2002

  • Fabrication and installation of water bath (SS 304 grade)
  • P.O. Date : 25-06-2002

  • Fabrication and installation of mezzanine floor with foundation
  • P.O. Date: 20-04-2002

  • Fabrication and erection of mineral oil tank 45 cubic meter with foundation
  • P.O. Date: 11-02-2002

  • Fabrication of water pipe line and motor fixing
  • P.O. Date: 14-11-2001

  • Fabrication and installation of safety guard for racks
  • P.O. Date: 28-11-2000

  • Fabrication and installation of HM mixer oil flushing drain line
  • P.O Date: 02-05-1998

CLIENT    :   SCHLUMBERGER (Middle East) Al-Khobar

WORKS DONE :

  • Fabrication of assembly table
  • P.O. Date : 26-08-2003

  • Fabrication of dolly
  • P.O. Date : 07-06-2003

  • Fabrication and machining of bush & spacer (brass)
  • P.O. Date : 05-04-2002

  • Fabrication and delivery of heavy stands for pipe
  • P.O. Date : 31-03-2002

  • Fabrication and installation of gratings on top of the tanks
  • P.O. Date : 20-03-2002

  • Fabrication and delivery of testing stand
  • P.O. Date : 28-02-2002

  • Fabrication and delivery of pipe stand
  • P.O. Date : 26-02-2002

  • Fabrication and delivery of cross over racks
  • P.O. Date : 06-02-2002

  • Fabrication and delivery of pipe racks
  • P.O. Date : 06-02-2002

CLIENT    :   NABORS DRILLING INTERNATIONAL LTD DHAHRAN.

WORKS DONE :

  • Fabrication and supply of drill collar bins
  • P.O Date : 12-04-2007

  • Fabrication and supply of light pole
  • P.O Date : 26-03-2007

  • Fabrication and supply of 25 ton pipe baskets
  • P.O Date : 20-03-2007

  • Fabrication and supply of pipe racks
  • P.O Date : 10-03-2007

  • Fabrication and supply of accumulator suitcase (Koomey Tray)
  • P.O. Date : 05-05-2005

  • Fabrication and supply of gas bottle transfer racks
  • P.O. Date : 30-06-2003

  • Fabrication and supply of catwalks
  • P.O. Date : 04-04-2003

  • Fabrication and delivery of pipe bins (25 Ton Capacity)
  • P.O. Date : 19-05-2002

  • Fabrication and delivery of pipe clamps
  • P.O. Date : 12-05-2002

  • Fabrication and delivery of walkways between tanks
  • P.O. Date : 11-05-2002

CLIENT    :   M/s. Weatherford Drilling International Dammam

WORKS DONE :

  • Fabrication and supply of portable water tanks
  • P.O. Date : 24-10-2006

  • Fabrication and supply of cylindrical fuel tank
  • P.O. Date : 24-10-2006

  • Fabrication and delivery of 4000Gal gasoline tank (Cylindrical)
  • P.O. Date : 13-10-2006

  • Fabrication and supply of mud reserve tank
  • P.O. Date : 11-11-2006

  • Fabrication and delivery of 570 bbl fuel tank
  • P.O. Date : 11-01-2006

CLIENT    :   M/s. DELMON SALT FACTORY Al- Khobar

WORKS DONE :

  • Fabrication and supply of bucket elevator
  • P.O. Date : 22-11-2007

  • Fabrication and supply of impellers
  • P.O. Date : 12-11-2007

  • Fabrication and supply of 8mtr long screw conveyor
  • P.O. Date : 24-04-2007

  • Fabrication and supply of 5.1mtr long screw conveyor
  • P.O. Date : 24-04-2007

  • Fabrication and supply of ducts
  • P.O. Date : 24-04-2007

  • Fabrication and supply of structural support for centrifuge
  • P.O. Date : 22- 04-2007

  • Fabrication and supply of chutes
  • P.O. Date : 22-04-2007

  • Fabrication and installation of structural platform, elutriation tank, washing tank, Silos etc.
  • P.O. Date : 27-11-2006